CARDINAL ARCHITECTURAL (LOUVERED ROOF)
POWERED BY CADdetails.com
Pre-assembled Collections CLICK ON THE LISTING BELOW TO DOWNLOAD FILES Back To Top
CAD
3D
Specs
About
Media
Education
PrintCAD
Close
1
Schedule 4A (Vult=116 Mph): Non-Reinforced Aluminum Beam Spans
Close
2
Schedule 35A (Vult=142 Mph): Non-Reinforced Aluminum Beam Spans
Close
3
Schedule 35A (Vult=142 Mph): Non-Reinforced Aluminum Beam Spans
Close
4
Schedule 36 (Vult=142 Mph): Double Reinforced Aluminum Beam Spans
Close
5
Schedule 4A: Non-Reinforced Beam Spans (1/2)
Close
6
Schedule 4B: Reinforced Aluminum Beam Spans (1/2)
Close
7
Schedule 3A: Non-Reinforced Purlin Spans
Close
8
Schedule 5A: Double Reinforced Aluminum Beam Spans (1/2)
Close
9
Schedule 6: Double Non-Reinfocred Aluminum Beam Spans (1/2)
Close
10
Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
11
Alternative Purlin to Beam to Post Connection (Aluminum) - Veritcal Section
Close
12
Purlin to Double Beam to Post Connection (Aluminum) - Vertical Section
Close
13
Purlin to Double Beam to Post Connection (Aluminum) - Double Beam Bracket - Isometric
Close
14
Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
15
Alternative Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
16
Purlin to Beam to Post Connection (Aluminum) - Post to Footer/Slab - Elevation
Close
17
4" Louver
Close
18
8" Louver
Close
19
Purlin
Close
20
Beam (Aluminum)
Close
21
Post (Aluminum)
Close
22
Beam Insert
Close
23
Purlin Reinforcing
Close
24
Post Top/Base Plate w/Insert
Close
25
Purlin/Beam Bracket
Close
26
Riser Bracket
Close
27
Typical Footer
Close
28
Post Base Aluminum Beam Detail - Plan View
Close
29
Post Embed Detail - Elevation
Close
30
Purlin/Beam End to Host - Vertical Section
Close
31
Purlin/Beam End to Host - Top View
Close
32
Beam End to Host (Riser Bracket) - Vertical Section
Close
33
Alternative Beam/Purlin End to Host - Vertical Section
Close
34
Riser Bracket (to Aluminum Beam)
Close
35
Post to Base Aluminum Beam Connection - Elevation
Close
36
Post to Beam Conncetion Type #1 - Elevation
Close
37
Post to Beam Conncetion Type #1 - Section
Close
38
Post Beam Connection Types #2 and #3 - Elevation
Close
39
Post Beam Connection Types #2 and #3 - Section
Close
40
Adjustable Aluminum/Wood Louvered Canopy - Typical Canopy Plan - Aluminum
Close
41
Typical Canopy - Front Elevation
Close
42
Typical Canopy - Side Elevation
Close
43
Extrusion Profiles - Cardinal Arch
Close
44
Schedule 1 to 3 (Vult=116 MPH): Design Pressures, Louver Spans, & Purlin Spans
Close
45
Schedule 4B (Vult=116 Mph): Reinforced Aluminum Beam Spans
Close
46
Schedule 5 (Vult=116 MPH): Double Reinforced Aluminum Beam Spans
Close
47
Schedule 6 (Vult=116 MPH): Double Non-Reinforced Aluminum Beam Spans
Close
48
Schedule 8 to 11: Max Aluminum Post Height, 116 MPH-EXP, 10 & 20 PSF Live Load
Close
49
Schedule 12 to 15: Max Aluminum Post Height, 116 MPH-EXP, 30 & 40 PSF Live Load
Close
50
Schedule 24 to 27: Footer Width, 116 MPH-EXP, 10 & 20 PSF Live Load
Close
51
Schedule 28 to 31: Footer Width, 116 MPH-EXP, 30 & 40 PSF Live Load
Close
52
Schedule 32 to 34 (Vult=142 MPH): Design Pressures, Louver Spans, & Purlin Spans
Close
53
Schedule 35B (Vult=142 Mph): Reinforced Aluminum Beam Spans
Close
54
Schedule 36 (Vult=142 MPH): Double Reinforced Aluminum Beam Spans
Close
55
Schedule 37 (Vult=142 MPH): Non-Reinforced Double Aluminum Beam Spans
Close
56
Schedule 39 to 42: Max Aluminum Post Height, 142 MPH-EXP, 10 & 20 PSF Live Load
Close
57
Schedule 43 to 46: Max Aluminum Post Height, 142 MPH-EXP, 30 & 40 PSF Live Load
Close
58
Schedule 55 to 58: Footer Width, 142 MPH-EXP, 10 & 20 PSF Live Load
Close
59
Schedule 59 to 62: Footer Width, 142 MPH-EXP, 30 & 40 PSF Live Load
Close
60
Schedule 63: Footer Reinforcement
Close
61
Schedule 1 to 3 (Vult=116 MPH): Design Pressures, Louver Spans, & Purlin Spans
Close
62
Schedule 4a & 4b (Vult=116 MPH): Non-Reinforced & Reinforced Aluminum Beam Spans
Close
63
Schedule 5 & 6 (Vult=116 MPH): Double Reinforced & Non-Reinforced Aluminum Beam Spans
Close
64
Schedule 8 to 11: Max Aluminum Post Height, 116 MPH-EXP, 10 & 20 PSF Live Load
Close
65
Schedule 12 to 15: Max Aluminum Post Height, 116 MPH-EXP, 30 & 40 PSF Live Load
Close
66
Schedule 24 to 27: Footer Width, 116 MPH-EXP, 10 & 20 PSF Live Load
Close
67
Schedule 28 to 31: Footer Width, 116 MPH-EXP, 30 & 40 PSF Live Load
Close
68
Schedule 32 to 34 (Vult=142 MPH): Design Pressures, Louver Spans, & Purlin Spans
Close
69
Schedule 35B (Vult=142 Mph): Reinforced Aluminum Beam Spans
Close
70
Schedule 37 (Vult=142 Mph): Non-Reinforced Double Aluminum Beam Spans
Close
71
Schedule 39 to 42: Max Aluminum Post Height, 142, MPH-EXP, 10 & 20 PSF Live Load
Close
72
Schedule 43 to 46: Max Aluminum Post Height, 142, MPH-EXP, 30 & 40 PSF Live Load
Close
73
Schedule 55 to 58: Footer Width, 142 MPH-EXP, 10 & 20 PSF Live Load
Close
74
Schedule 59 to 62: Footer Width, 142 MPH-EXP, 30 & 40 PSF Live Load
Close
75
Schedule 63: Footer Reinforcement
Close
76
Florida - Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
77
Florida - Alternative Purlin to Beam to Post Connection (Aluminum) - Veritcal Section
Close
78
Florida - Purlin to Double Beam to Post Connection (Aluminum) - Vertical Section
Close
79
Florida - Purlin to Double Beam to Post Connection (Aluminum) - Double Beam Bracket - Isometric
Close
80
Florida - Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
81
Florida - Alternative Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
82
Florida - Purlin to Beam to Post Connection (Aluminum) - Post to Footer/Slab - Elevation
Close
83
Florida - Louver
Close
84
Florida - Purlin
Close
85
Florida - Beam (Aluminum)
Close
86
Florida - Post (Aluminum)
Close
87
Florida - Beam Insert
Close
88
Florida - Purlin Reinforcing
Close
89
Florida - Post Top/Base Plate w/Insert
Close
90
Florida - Purlin/Beam Bracket
Close
91
Florida - Riser Bracket
Close
92
Florida - Typical Footer
Close
93
Florida - Post Base Aluminum Beam Detail - Plan View
Close
94
Florida - Post Embed Detail - Elevation
Close
95
Florida - Purlin/Beam End to Host - Vertical Section
Close
96
Florida - Purlin/Beam End to Host - Top View
Close
97
Florida - Beam End to Host (Riser Bracket) - Vertical Section
Close
98
Florida - Alternative Beam/Purlin End to Host - Vertical Section
Close
99
Florida - Riser Bracket (to Aluminum Beam)
Close
100
Florida - Post to Base Aluminum Beam Connection - Elevation
Close
101
Florida - Post to Beam Conncetion Type #1 - Elevation
Close
102
Florida - Post to Beam Conncetion Type #1 - Section
Close
103
Florida - Post Beam Connection Types #2 and #3 - Elevation
Close
104
Florida - Post Beam Connection Types #2 and #3 - Section
Close
105
Florida - Typical Canopy - Front Elevation
Close
106
Florida - Typical Canopy - Side Elevation
Close
107
Florida - Adjustable Aluminum/Wood Louvered Canopy - Typical Canopy Plan - Aluminum
Close
108
Schedule 1: Design Pressures
Close
109
Schedule 2: Louver Spans SPANS
Close
110
Schedule3B: Reinforced Purlin Spans
Close
111
Schedule 4A: Non-Reinforced Beam Spans (2/2)
Close
112
Schedule 4B: Reinforced Aluminum Beam Spans (2/2)
Close
113
Schedule 5A: Double Reinforced Aluminum Beam Spans (2/2)
Close
114
Schedule 6: Double Non-Reinfocred Aluminum Beam Spans (2/2)
Close
115
Schedule 16: Max Aluminum Post Height, 130B
Close
116
Schedule 17: Max Aluminum Post Height, 130 C & 145 B
Close
117
Schedule 18: Max Aluminum Post Height, 145 C & 155 B
Close
118
Schedule 19: Max Aluminum Post Height, 155 C & 165 B
Close
119
Schedule 20: Max Aluminum Post Height,165 C & 170 B
Close
120
Schedule 21: Max Aluminum Post Height,170 C
Close
121
Schedule 22: Max Aluminum Post Height, 175 C
Close
122
Schedule 23: Max Aluminum Post Height, 180 C
Close
123
Schedule 32: Footer Width (Aluminum Post), 130 B
Close
124
Schedule 33: Footer Width (Aluminum Post), 130 C & 145 B
Close
125
Schedule 34: Footer Width (Aluminum Post), 145 C & 155 B
Close
126
Schedule 35: Footer Width (Aluminum Post), 155 C & 165 B
Close
127
Schedule 36: Footer Width (Aluminum Post), 165 C & 170 B
Close
128
Schedule 37: Footer Width (Aluminum Post), 170 C
Close
129
Schedule 38: Footer Width (Aluminum Post), 175 C
Close
130
Schedule 39: Footer Width (Aluminum Post), 180 C
Close
131
Schedule 40: Footer Reinforcement
Close
132
Post Base Beam Connection Schedules