CARDINAL ARCHITECTURAL (LOUVERED ROOF)
Designers Microsite |
POWERED BY CADdetails.com

Pre-assembled Collections CLICK ON THE LISTING BELOW TO DOWNLOAD FILES Back To Top

CAD
3D
Specs
About
Media
Education
PrintCAD
Close
1
Schedule 4A (Vult=116 Mph): Non-Reinforced Aluminum Beam Spans
Close
2
Schedule 35A (Vult=142 Mph): Non-Reinforced Aluminum Beam Spans
Close
3
Schedule 35A (Vult=142 Mph): Non-Reinforced Aluminum Beam Spans
Close
4
Schedule 36 (Vult=142 Mph): Double Reinforced Aluminum Beam Spans
Close
5
Schedule 4A: Non-Reinforced Beam Spans (1/2)
Close
6
Schedule 4B: Reinforced Aluminum Beam Spans (1/2)
Close
7
Schedule 3A: Non-Reinforced Purlin Spans
Close
8
Schedule 5A: Double Reinforced Aluminum Beam Spans (1/2)
Close
9
Schedule 6: Double Non-Reinfocred Aluminum Beam Spans (1/2)
Close
10
Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
11
Alternative Purlin to Beam to Post Connection (Aluminum) - Veritcal Section
Close
12
Purlin to Double Beam to Post Connection (Aluminum) - Vertical Section
Close
13
Purlin to Double Beam to Post Connection (Aluminum) - Double Beam Bracket - Isometric
Close
14
Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
15
Alternative Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
16
Purlin to Beam to Post Connection (Aluminum) - Post to Footer/Slab - Elevation
Close
17
4" Louver
Close
18
8" Louver
Close
19
Purlin
Close
20
Beam (Aluminum)
Close
21
Post (Aluminum)
Close
22
Beam Insert
Close
23
Purlin Reinforcing
Close
24
Post Top/Base Plate w/Insert
Close
25
Purlin/Beam Bracket
Close
26
Riser Bracket
Close
27
Typical Footer
Close
28
Post Base Aluminum Beam Detail - Plan View
Close
29
Post Embed Detail - Elevation
Close
30
Purlin/Beam End to Host - Vertical Section
Close
31
Purlin/Beam End to Host - Top View
Close
32
Beam End to Host (Riser Bracket) - Vertical Section
Close
33
Alternative Beam/Purlin End to Host - Vertical Section
Close
34
Riser Bracket (to Aluminum Beam)
Close
35
Post to Base Aluminum Beam Connection - Elevation
Close
36
Post to Beam Conncetion Type #1 - Elevation
Close
37
Post to Beam Conncetion Type #1 - Section
Close
38
Post Beam Connection Types #2 and #3 - Elevation
Close
39
Post Beam Connection Types #2 and #3 - Section
Close
40
Adjustable Aluminum/Wood Louvered Canopy - Typical Canopy Plan - Aluminum
Close
41
Typical Canopy - Front Elevation
Close
42
Typical Canopy - Side Elevation
Close
43
Extrusion Profiles - Cardinal Arch
Close
44
Schedule 1 to 3 (Vult=116 MPH): Design Pressures, Louver Spans, & Purlin Spans
Close
45
Schedule 4B (Vult=116 Mph): Reinforced Aluminum Beam Spans
Close
46
Schedule 5 (Vult=116 MPH): Double Reinforced Aluminum Beam Spans
Close
47
Schedule 6 (Vult=116 MPH): Double Non-Reinforced Aluminum Beam Spans
Close
48
Schedule 8 to 11: Max Aluminum Post Height, 116 MPH-EXP, 10 & 20 PSF Live Load
Close
49
Schedule 12 to 15: Max Aluminum Post Height, 116 MPH-EXP, 30 & 40 PSF Live Load
Close
50
Schedule 24 to 27: Footer Width, 116 MPH-EXP, 10 & 20 PSF Live Load
Close
51
Schedule 28 to 31: Footer Width, 116 MPH-EXP, 30 & 40 PSF Live Load
Close
52
Schedule 32 to 34 (Vult=142 MPH): Design Pressures, Louver Spans, & Purlin Spans
Close
53
Schedule 35B (Vult=142 Mph): Reinforced Aluminum Beam Spans
Close
54
Schedule 36 (Vult=142 MPH): Double Reinforced Aluminum Beam Spans
Close
55
Schedule 37 (Vult=142 MPH): Non-Reinforced Double Aluminum Beam Spans
Close
56
Schedule 39 to 42: Max Aluminum Post Height, 142 MPH-EXP, 10 & 20 PSF Live Load
Close
57
Schedule 43 to 46: Max Aluminum Post Height, 142 MPH-EXP, 30 & 40 PSF Live Load
Close
58
Schedule 55 to 58: Footer Width, 142 MPH-EXP, 10 & 20 PSF Live Load
Close
59
Schedule 59 to 62: Footer Width, 142 MPH-EXP, 30 & 40 PSF Live Load
Close
60
Schedule 63: Footer Reinforcement
Close
61
Schedule 1 to 3 (Vult=116 MPH): Design Pressures, Louver Spans, & Purlin Spans
Close
62
Schedule 4a & 4b (Vult=116 MPH): Non-Reinforced & Reinforced Aluminum Beam Spans
Close
63
Schedule 5 & 6 (Vult=116 MPH): Double Reinforced & Non-Reinforced Aluminum Beam Spans
Close
64
Schedule 8 to 11: Max Aluminum Post Height, 116 MPH-EXP, 10 & 20 PSF Live Load
Close
65
Schedule 12 to 15: Max Aluminum Post Height, 116 MPH-EXP, 30 & 40 PSF Live Load
Close
66
Schedule 24 to 27: Footer Width, 116 MPH-EXP, 10 & 20 PSF Live Load
Close
67
Schedule 28 to 31: Footer Width, 116 MPH-EXP, 30 & 40 PSF Live Load
Close
68
Schedule 32 to 34 (Vult=142 MPH): Design Pressures, Louver Spans, & Purlin Spans
Close
69
Schedule 35B (Vult=142 Mph): Reinforced Aluminum Beam Spans
Close
70
Schedule 37 (Vult=142 Mph): Non-Reinforced Double Aluminum Beam Spans
Close
71
Schedule 39 to 42: Max Aluminum Post Height, 142, MPH-EXP, 10 & 20 PSF Live Load
Close
72
Schedule 43 to 46: Max Aluminum Post Height, 142, MPH-EXP, 30 & 40 PSF Live Load
Close
73
Schedule 55 to 58: Footer Width, 142 MPH-EXP, 10 & 20 PSF Live Load
Close
74
Schedule 59 to 62: Footer Width, 142 MPH-EXP, 30 & 40 PSF Live Load
Close
75
Schedule 63: Footer Reinforcement
Close
76
Florida - Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
77
Florida - Alternative Purlin to Beam to Post Connection (Aluminum) - Veritcal Section
Close
78
Florida - Purlin to Double Beam to Post Connection (Aluminum) - Vertical Section
Close
79
Florida - Purlin to Double Beam to Post Connection (Aluminum) - Double Beam Bracket - Isometric
Close
80
Florida - Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
81
Florida - Alternative Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Close
82
Florida - Purlin to Beam to Post Connection (Aluminum) - Post to Footer/Slab - Elevation
Close
83
Florida - Louver
Close
84
Florida - Purlin
Close
85
Florida - Beam (Aluminum)
Close
86
Florida - Post (Aluminum)
Close
87
Florida - Beam Insert
Close
88
Florida - Purlin Reinforcing
Close
89
Florida - Post Top/Base Plate w/Insert
Close
90
Florida - Purlin/Beam Bracket
Close
91
Florida - Riser Bracket
Close
92
Florida - Typical Footer
Close
93
Florida - Post Base Aluminum Beam Detail - Plan View
Close
94
Florida - Post Embed Detail - Elevation
Close
95
Florida - Purlin/Beam End to Host - Vertical Section
Close
96
Florida - Purlin/Beam End to Host - Top View
Close
97
Florida - Beam End to Host (Riser Bracket) - Vertical Section
Close
98
Florida - Alternative Beam/Purlin End to Host - Vertical Section
Close
99
Florida - Riser Bracket (to Aluminum Beam)
Close
100
Florida - Post to Base Aluminum Beam Connection - Elevation
Close
101
Florida - Post to Beam Conncetion Type #1 - Elevation
Close
102
Florida - Post to Beam Conncetion Type #1 - Section
Close
103
Florida - Post Beam Connection Types #2 and #3 - Elevation
Close
104
Florida - Post Beam Connection Types #2 and #3 - Section
Close
105
Florida - Typical Canopy - Front Elevation
Close
106
Florida - Typical Canopy - Side Elevation
Close
107
Florida - Adjustable Aluminum/Wood Louvered Canopy - Typical Canopy Plan - Aluminum
Close
108
Schedule 1: Design Pressures
Close
109
Schedule 2: Louver Spans SPANS
Close
110
Schedule3B: Reinforced Purlin Spans
Close
111
Schedule 4A: Non-Reinforced Beam Spans (2/2)
Close
112
Schedule 4B: Reinforced Aluminum Beam Spans (2/2)
Close
113
Schedule 5A: Double Reinforced Aluminum Beam Spans (2/2)
Close
114
Schedule 6: Double Non-Reinfocred Aluminum Beam Spans (2/2)
Close
115
Schedule 16: Max Aluminum Post Height, 130B
Close
116
Schedule 17: Max Aluminum Post Height, 130 C & 145 B
Close
117
Schedule 18: Max Aluminum Post Height, 145 C & 155 B
Close
118
Schedule 19: Max Aluminum Post Height, 155 C & 165 B
Close
119
Schedule 20: Max Aluminum Post Height,165 C & 170 B
Close
120
Schedule 21: Max Aluminum Post Height,170 C
Close
121
Schedule 22: Max Aluminum Post Height, 175 C
Close
122
Schedule 23: Max Aluminum Post Height, 180 C
Close
123
Schedule 32: Footer Width (Aluminum Post), 130 B
Close
124
Schedule 33: Footer Width (Aluminum Post), 130 C & 145 B
Close
125
Schedule 34: Footer Width (Aluminum Post), 145 C & 155 B
Close
126
Schedule 35: Footer Width (Aluminum Post), 155 C & 165 B
Close
127
Schedule 36: Footer Width (Aluminum Post), 165 C & 170 B
Close
128
Schedule 37: Footer Width (Aluminum Post), 170 C
Close
129
Schedule 38: Footer Width (Aluminum Post), 175 C
Close
130
Schedule 39: Footer Width (Aluminum Post), 180 C
Close
131
Schedule 40: Footer Reinforcement
Close
132
Post Base Beam Connection Schedules

All Available 2D CAD Files Back To Top

CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 4A (Vult=116 Mph): Non-Reinforced Aluminum Beam Spans
Schedule 4A (Vult=116 Mph):...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 35A (Vult=142 Mph): Non-Reinforced Aluminum Beam Spans
Schedule 35A (Vult=142 Mph):...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 35A (Vult=142 Mph): Non-Reinforced Aluminum Beam Spans
Schedule 35A (Vult=142 Mph):...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 36 (Vult=142 Mph): Double Reinforced Aluminum Beam Spans
Schedule 36 (Vult=142 Mph): Double...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 4A: Non-Reinforced Beam Spans (1/2)
Schedule 4A: Non-Reinforced Beam Spans...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 4B: Reinforced Aluminum Beam Spans (1/2)
Schedule 4B: Reinforced Aluminum Beam...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 3A: Non-Reinforced Purlin Spans
Schedule 3A: Non-Reinforced Purlin Spans
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 5A: Double Reinforced Aluminum Beam Spans (1/2)
Schedule 5A: Double Reinforced Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 6: Double Non-Reinfocred Aluminum Beam Spans (1/2)
Schedule 6: Double Non-Reinfocred...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) 4" Louver
4" Louver
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) 8" Louver
8" Louver
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Adjustable Aluminum/Wood Louvered Canopy - Typical Canopy Plan - Aluminum
Adjustable Aluminum/Wood Louvered...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Alternative Beam/Purlin End to Host - Vertical Section
Alternative Beam/Purlin End to Host -...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Alternative Purlin to Beam to Post Connection (Aluminum) - Veritcal Section
Alternative Purlin to Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Alternative Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Alternative Purlin to Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Beam (Aluminum)
Beam (Aluminum)
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Beam End to Host (Riser Bracket) - Vertical Section
Beam End to Host (Riser Bracket) -...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Beam Insert
Beam Insert
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Extrusion Profiles - Cardinal Arch
Extrusion Profiles - Cardinal Arch
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Adjustable Aluminum/Wood Louvered Canopy - Typical Canopy Plan - Aluminum
Florida - Adjustable Aluminum/Wood...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Alternative Beam/Purlin End to Host - Vertical Section
Florida - Alternative Beam/Purlin End...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Alternative Purlin to Beam to Post Connection (Aluminum) - Veritcal Section
Florida - Alternative Purlin to Beam to...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Alternative Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Florida - Alternative Purlin to Beam to...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Beam (Aluminum)
Florida - Beam (Aluminum)
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Beam End to Host (Riser Bracket) - Vertical Section
Florida - Beam End to Host (Riser...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Beam Insert
Florida - Beam Insert
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Louver
Florida - Louver
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post (Aluminum)
Florida - Post (Aluminum)
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post Base Aluminum Beam Detail - Plan View
Florida - Post Base Aluminum Beam...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post Beam Connection Types #2 and #3 - Elevation
Florida - Post Beam Connection Types #2...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post Beam Connection Types #2 and #3 - Section
Florida - Post Beam Connection Types #2...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post Embed Detail - Elevation
Florida - Post Embed Detail - Elevation
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post to Base Aluminum Beam Connection - Elevation
Florida - Post to Base Aluminum Beam...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post to Beam Conncetion Type #1 - Elevation
Florida - Post to Beam Conncetion Type...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post to Beam Conncetion Type #1 - Section
Florida - Post to Beam Conncetion Type...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Post Top/Base Plate w/Insert
Florida - Post Top/Base Plate w/Insert
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin
Florida - Purlin
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin Reinforcing
Florida - Purlin Reinforcing
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin to Beam to Post Connection (Aluminum) - Post to Footer/Slab - Elevation
Florida - Purlin to Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Florida - Purlin to Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Florida - Purlin to Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin to Double Beam to Post Connection (Aluminum) - Double Beam Bracket - Isometric
Florida - Purlin to Double Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin to Double Beam to Post Connection (Aluminum) - Vertical Section
Florida - Purlin to Double Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin/Beam Bracket
Florida - Purlin/Beam Bracket
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin/Beam End to Host - Top View
Florida - Purlin/Beam End to Host - Top...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Purlin/Beam End to Host - Vertical Section
Florida - Purlin/Beam End to Host -...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Riser Bracket
Florida - Riser Bracket
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Riser Bracket (to Aluminum Beam)
Florida - Riser Bracket (to Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Typical Canopy - Front Elevation
Florida - Typical Canopy - Front...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Typical Canopy - Side Elevation
Florida - Typical Canopy - Side...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Florida - Typical Footer
Florida - Typical Footer
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post (Aluminum)
Post (Aluminum)
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post Base Aluminum Beam Detail - Plan View
Post Base Aluminum Beam Detail - Plan...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post Base Beam Connection Schedules
Post Base Beam Connection Schedules
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post Beam Connection Types #2 and #3 - Elevation
Post Beam Connection Types #2 and #3 -...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post Beam Connection Types #2 and #3 - Section
Post Beam Connection Types #2 and #3 -...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post Embed Detail - Elevation
Post Embed Detail - Elevation
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post to Base Aluminum Beam Connection - Elevation
Post to Base Aluminum Beam Connection -...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post to Beam Conncetion Type #1 - Elevation
Post to Beam Conncetion Type #1 -...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post to Beam Conncetion Type #1 - Section
Post to Beam Conncetion Type #1 -...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Post Top/Base Plate w/Insert
Post Top/Base Plate w/Insert
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin
Purlin
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin Reinforcing
Purlin Reinforcing
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin to Beam to Post Connection (Aluminum) - Post to Footer/Slab - Elevation
Purlin to Beam to Post Connection...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Purlin to Beam to Post Connection...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Purlin to Beam to Post Connection...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin to Double Beam to Post Connection (Aluminum) - Double Beam Bracket - Isometric
Purlin to Double Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin to Double Beam to Post Connection (Aluminum) - Vertical Section
Purlin to Double Beam to Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin/Beam Bracket
Purlin/Beam Bracket
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin/Beam End to Host - Top View
Purlin/Beam End to Host - Top View
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Purlin/Beam End to Host - Vertical Section
Purlin/Beam End to Host - Vertical...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Riser Bracket
Riser Bracket
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Riser Bracket (to Aluminum Beam)
Riser Bracket (to Aluminum Beam)
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 1 to 3 (Vult=116 MPH): Design Pressures, Louver Spans, & Purlin Spans
Schedule 1 to 3 (Vult=116 MPH): Design...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 1 to 3 (Vult=116 MPH): Design Pressures, Louver Spans, & Purlin Spans
Schedule 1 to 3 (Vult=116 MPH): Design...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 1: Design Pressures
Schedule 1: Design Pressures
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 12 to 15: Max Aluminum Post Height, 116 MPH-EXP, 30 & 40 PSF Live Load
Schedule 12 to 15: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 12 to 15: Max Aluminum Post Height, 116 MPH-EXP, 30 & 40 PSF Live Load
Schedule 12 to 15: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 16: Max Aluminum Post Height, 130B
Schedule 16: Max Aluminum Post Height,...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 17: Max Aluminum Post Height, 130 C & 145 B
Schedule 17: Max Aluminum Post Height,...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 18: Max Aluminum Post Height, 145 C & 155 B
Schedule 18: Max Aluminum Post Height,...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 19: Max Aluminum Post Height, 155 C & 165 B
Schedule 19: Max Aluminum Post Height,...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 2: Louver Spans SPANS
Schedule 2: Louver Spans SPANS
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 20: Max Aluminum Post Height,165 C & 170 B
Schedule 20: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 21: Max Aluminum Post Height,170 C
Schedule 21: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 22: Max Aluminum Post Height, 175 C
Schedule 22: Max Aluminum Post Height,...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 23: Max Aluminum Post Height, 180 C
Schedule 23: Max Aluminum Post Height,...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 24 to 27: Footer Width, 116 MPH-EXP, 10 & 20 PSF Live Load
Schedule 24 to 27: Footer Width, 116...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 24 to 27: Footer Width, 116 MPH-EXP, 10 & 20 PSF Live Load
Schedule 24 to 27: Footer Width, 116...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 28 to 31: Footer Width, 116 MPH-EXP, 30 & 40 PSF Live Load
Schedule 28 to 31: Footer Width, 116...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 28 to 31: Footer Width, 116 MPH-EXP, 30 & 40 PSF Live Load
Schedule 28 to 31: Footer Width, 116...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 32 to 34 (Vult=142 MPH): Design Pressures, Louver Spans, & Purlin Spans
Schedule 32 to 34 (Vult=142 MPH):...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 32 to 34 (Vult=142 MPH): Design Pressures, Louver Spans, & Purlin Spans
Schedule 32 to 34 (Vult=142 MPH):...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 32: Footer Width (Aluminum Post), 130 B
Schedule 32: Footer Width (Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 33: Footer Width (Aluminum Post), 130 C & 145 B
Schedule 33: Footer Width (Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 34: Footer Width (Aluminum Post), 145 C & 155 B
Schedule 34: Footer Width (Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 35: Footer Width (Aluminum Post), 155 C & 165 B
Schedule 35: Footer Width (Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 35B (Vult=142 Mph): Reinforced Aluminum Beam Spans
Schedule 35B (Vult=142 Mph): Reinforced...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 35B (Vult=142 Mph): Reinforced Aluminum Beam Spans
Schedule 35B (Vult=142 Mph): Reinforced...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 36 (Vult=142 MPH): Double Reinforced Aluminum Beam Spans
Schedule 36 (Vult=142 MPH): Double...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 36: Footer Width (Aluminum Post), 165 C & 170 B
Schedule 36: Footer Width (Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 37 (Vult=142 Mph): Non-Reinforced Double Aluminum Beam Spans
Schedule 37 (Vult=142 Mph):...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 37 (Vult=142 MPH): Non-Reinforced Double Aluminum Beam Spans
Schedule 37 (Vult=142 MPH):...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 37: Footer Width (Aluminum Post), 170 C
Schedule 37: Footer Width (Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 38: Footer Width (Aluminum Post), 175 C
Schedule 38: Footer Width (Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 39 to 42: Max Aluminum Post Height, 142 MPH-EXP, 10 & 20 PSF Live Load
Schedule 39 to 42: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 39 to 42: Max Aluminum Post Height, 142, MPH-EXP, 10 & 20 PSF Live Load
Schedule 39 to 42: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 39: Footer Width (Aluminum Post), 180 C
Schedule 39: Footer Width (Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 40: Footer Reinforcement
Schedule 40: Footer Reinforcement
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 43 to 46: Max Aluminum Post Height, 142 MPH-EXP, 30 & 40 PSF Live Load
Schedule 43 to 46: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 43 to 46: Max Aluminum Post Height, 142, MPH-EXP, 30 & 40 PSF Live Load
Schedule 43 to 46: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 4a & 4b (Vult=116 MPH): Non-Reinforced & Reinforced Aluminum Beam Spans
Schedule 4a & 4b (Vult=116 MPH):...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 4A: Non-Reinforced Beam Spans (2/2)
Schedule 4A: Non-Reinforced Beam Spans...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 4B (Vult=116 Mph): Reinforced Aluminum Beam Spans
Schedule 4B (Vult=116 Mph): Reinforced...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 4B: Reinforced Aluminum Beam Spans (2/2)
Schedule 4B: Reinforced Aluminum Beam...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 5 & 6 (Vult=116 MPH): Double Reinforced & Non-Reinforced Aluminum Beam Spans
Schedule 5 & 6 (Vult=116 MPH): Double...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 5 (Vult=116 MPH): Double Reinforced Aluminum Beam Spans
Schedule 5 (Vult=116 MPH): Double...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 55 to 58: Footer Width, 142 MPH-EXP, 10 & 20 PSF Live Load
Schedule 55 to 58: Footer Width, 142...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 55 to 58: Footer Width, 142 MPH-EXP, 10 & 20 PSF Live Load
Schedule 55 to 58: Footer Width, 142...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 59 to 62: Footer Width, 142 MPH-EXP, 30 & 40 PSF Live Load
Schedule 59 to 62: Footer Width, 142...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 59 to 62: Footer Width, 142 MPH-EXP, 30 & 40 PSF Live Load
Schedule 59 to 62: Footer Width, 142...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 5A: Double Reinforced Aluminum Beam Spans (2/2)
Schedule 5A: Double Reinforced Aluminum...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 6 (Vult=116 MPH): Double Non-Reinforced Aluminum Beam Spans
Schedule 6 (Vult=116 MPH): Double...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 6: Double Non-Reinfocred Aluminum Beam Spans (2/2)
Schedule 6: Double Non-Reinfocred...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 63: Footer Reinforcement
Schedule 63: Footer Reinforcement
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 63: Footer Reinforcement
Schedule 63: Footer Reinforcement
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 8 to 11: Max Aluminum Post Height, 116 MPH-EXP, 10 & 20 PSF Live Load
Schedule 8 to 11: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule 8 to 11: Max Aluminum Post Height, 116 MPH-EXP, 10 & 20 PSF Live Load
Schedule 8 to 11: Max Aluminum Post...
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Schedule3B: Reinforced Purlin Spans
Schedule3B: Reinforced Purlin Spans
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Typical Canopy - Front Elevation
Typical Canopy - Front Elevation
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Typical Canopy - Side Elevation
Typical Canopy - Side Elevation
View CAD
CAD Drawings Cardinal Architectural (Louvered Roof) Typical Footer
Typical Footer
View CAD

All Available BIM and 3D Files Back To Top

BIM Object Cardinal Architectural (Louvered Roof) Florida - Purlin to Beam to Post Connection (Aluminum) - Vertical Section
Florida - Purlin to Beam to Post...
View 3D

All Available Specifications Back To Top

Schedule 4A (Vult=116 Mph):...
View Spec
Schedule 35A (Vult=142 Mph):...
View Spec
Schedule 35A (Vult=142 Mph):...
View Spec
Schedule 36 (Vult=142 Mph): Double...
View Spec
Schedule 4A: Non-Reinforced Beam Spans...
View Spec
Schedule 4B: Reinforced Aluminum Beam...
View Spec
Schedule 3A: Non-Reinforced Purlin Spans
View Spec
Schedule 5A: Double Reinforced Aluminum...
View Spec
Schedule 6: Double Non-Reinfocred...
View Spec
4" Louver
View Spec
8" Louver
View Spec
Adjustable Aluminum/Wood Louvered...
View Spec
Alternative Beam/Purlin End to Host -...
View Spec
Alternative Purlin to Beam to Post...
View Spec
Alternative Purlin to Beam to Post...
View Spec
Beam (Aluminum)
View Spec
Beam End to Host (Riser Bracket) -...
View Spec
Beam Insert
View Spec
Extrusion Profiles - Cardinal Arch
View Spec
Florida - Adjustable Aluminum/Wood...
View Spec
Florida - Alternative Beam/Purlin End...
View Spec
Florida - Alternative Purlin to Beam to...
View Spec
Florida - Alternative Purlin to Beam to...
View Spec
Florida - Beam (Aluminum)
View Spec
Florida - Beam End to Host (Riser...
View Spec
Florida - Beam Insert
View Spec
Florida - Louver
View Spec
Florida - Post (Aluminum)
View Spec
Florida - Post Base Aluminum Beam...
View Spec
Florida - Post Beam Connection Types #2...
View Spec
Florida - Post Beam Connection Types #2...
View Spec
Florida - Post Embed Detail - Elevation
View Spec
Florida - Post to Base Aluminum Beam...
View Spec
Florida - Post to Beam Conncetion Type...
View Spec
Florida - Post to Beam Conncetion Type...
View Spec
Florida - Post Top/Base Plate w/Insert
View Spec
Florida - Purlin
View Spec
Florida - Purlin Reinforcing
View Spec
Florida - Purlin to Beam to Post...
View Spec
Florida - Purlin to Beam to Post...
View Spec
Florida - Purlin to Beam to Post...
View Spec
Florida - Purlin to Double Beam to Post...
View Spec
Florida - Purlin to Double Beam to Post...
View Spec
Florida - Purlin/Beam Bracket
View Spec
Florida - Purlin/Beam End to Host - Top...
View Spec
Florida - Purlin/Beam End to Host -...
View Spec
Florida - Riser Bracket
View Spec
Florida - Riser Bracket (to Aluminum...
View Spec
Florida - Typical Canopy - Front...
View Spec
Florida - Typical Canopy - Side...
View Spec
Florida - Typical Footer
View Spec
Post (Aluminum)
View Spec
Post Base Aluminum Beam Detail - Plan...
View Spec
Post Base Beam Connection Schedules
View Spec
Post Beam Connection Types #2 and #3 -...
View Spec
Post Beam Connection Types #2 and #3 -...
View Spec
Post Embed Detail - Elevation
View Spec
Post to Base Aluminum Beam Connection -...
View Spec
Post to Beam Conncetion Type #1 -...
View Spec
Post to Beam Conncetion Type #1 -...
View Spec
Post Top/Base Plate w/Insert
View Spec
Purlin Reinforcing
View Spec
Purlin to Beam to Post Connection...
View Spec
Purlin to Beam to Post Connection...
View Spec
Purlin to Beam to Post Connection...
View Spec
Purlin to Double Beam to Post...
View Spec
Purlin to Double Beam to Post...
View Spec
Purlin/Beam Bracket
View Spec
Purlin/Beam End to Host - Top View
View Spec
Purlin/Beam End to Host - Vertical...
View Spec
Riser Bracket
View Spec
Riser Bracket (to Aluminum Beam)
View Spec
Schedule 1 to 3 (Vult=116 MPH): Design...
View Spec
Schedule 1 to 3 (Vult=116 MPH): Design...
View Spec
Schedule 1: Design Pressures
View Spec
Schedule 12 to 15: Max Aluminum Post...
View Spec
Schedule 12 to 15: Max Aluminum Post...
View Spec
Schedule 16: Max Aluminum Post Height,...
View Spec
Schedule 17: Max Aluminum Post Height,...
View Spec
Schedule 18: Max Aluminum Post Height,...
View Spec
Schedule 19: Max Aluminum Post Height,...
View Spec
Schedule 2: Louver Spans SPANS
View Spec
Schedule 20: Max Aluminum Post...
View Spec
Schedule 21: Max Aluminum Post...
View Spec
Schedule 22: Max Aluminum Post Height,...
View Spec
Schedule 23: Max Aluminum Post Height,...
View Spec
Schedule 24 to 27: Footer Width, 116...
View Spec
Schedule 24 to 27: Footer Width, 116...
View Spec
Schedule 28 to 31: Footer Width, 116...
View Spec
Schedule 28 to 31: Footer Width, 116...
View Spec
Schedule 32 to 34 (Vult=142 MPH):...
View Spec
Schedule 32 to 34 (Vult=142 MPH):...
View Spec
Schedule 32: Footer Width (Aluminum...
View Spec
Schedule 33: Footer Width (Aluminum...
View Spec
Schedule 34: Footer Width (Aluminum...
View Spec
Schedule 35: Footer Width (Aluminum...
View Spec
Schedule 35B (Vult=142 Mph): Reinforced...
View Spec
Schedule 35B (Vult=142 Mph): Reinforced...
View Spec
Schedule 36 (Vult=142 MPH): Double...
View Spec
Schedule 36: Footer Width (Aluminum...
View Spec
Schedule 37 (Vult=142 Mph):...
View Spec
Schedule 37 (Vult=142 MPH):...
View Spec
Schedule 37: Footer Width (Aluminum...
View Spec
Schedule 38: Footer Width (Aluminum...
View Spec
Schedule 39 to 42: Max Aluminum Post...
View Spec
Schedule 39 to 42: Max Aluminum Post...
View Spec
Schedule 39: Footer Width (Aluminum...
View Spec
Schedule 40: Footer Reinforcement
View Spec
Schedule 43 to 46: Max Aluminum Post...
View Spec
Schedule 43 to 46: Max Aluminum Post...
View Spec
Schedule 4a & 4b (Vult=116 MPH):...
View Spec
Schedule 4A: Non-Reinforced Beam Spans...
View Spec
Schedule 4B (Vult=116 Mph): Reinforced...
View Spec
Schedule 4B: Reinforced Aluminum Beam...
View Spec
Schedule 5 & 6 (Vult=116 MPH): Double...
View Spec
Schedule 5 (Vult=116 MPH): Double...
View Spec
Schedule 55 to 58: Footer Width, 142...
View Spec
Schedule 55 to 58: Footer Width, 142...
View Spec
Schedule 59 to 62: Footer Width, 142...
View Spec
Schedule 59 to 62: Footer Width, 142...
View Spec
Schedule 5A: Double Reinforced Aluminum...
View Spec
Schedule 6 (Vult=116 MPH): Double...
View Spec
Schedule 6: Double Non-Reinfocred...
View Spec
Schedule 63: Footer Reinforcement
View Spec
Schedule 63: Footer Reinforcement
View Spec
Schedule 8 to 11: Max Aluminum Post...
View Spec
Schedule 8 to 11: Max Aluminum Post...
View Spec
Schedule3B: Reinforced Purlin Spans
View Spec
Typical Canopy - Front Elevation
View Spec
Typical Canopy - Side Elevation
View Spec
Typical Footer
View Spec

Company Resource Files Back To Top

Acting Globally
Motorize Pergola
Residential
Restaurant
Retractable Shades