MRC Recreation |
POWERED BY CADdetails.com
GT IMPAX
1.
GT IMPAX: Sub Base Site Prep
2.
GT IMPAX: ½’ Pip Wear Course Over Concrete / Asphalt (No Attenuation)
3.
GT IMPAX: Pip Bordered By Concrete (Preferred New Construction)
4.
GT IMPAX: Above Grade Pip Install - Concrete / Asphalt
5.
GT IMPAX: Flush Mount To Wall, Curb, Or Sidewalk (Existing Construction)
6.
GT IMPAX: Post / Pole Edge Pip Installation
7.
GT IMPAX: ½" Pip Over Concrete / Asphalt (Rolled Edge At Fence / Perimeter)
8.
GT IMPAX: Pip Installation Around Chain
9.
GT IMPAX: Pip Step Seam (Color / Design Work)
10.
GT IMPAX: ½" Wear Course Over Concrete Or Asphalt